Primary and junior suite, main and second story addition with baths and main floor upgrades. located in Denver Colorado, City Park, Washington park neighborhoods
This unique project was a full two-story addition and home expansion completed by Remaster Renovations, focused on combining structural strength with high-end modern luxury. The scope was complex, so we began with detailed planning to make sure the new spaces would integrate with the existing home and meet Denver metro building standards.
We started construction with precision excavation to establish the new footprint. Next came a specialized engineered structural foundation designed specifically for the loads and layout of this two-story addition. Those early steps set a solid base for everything that followed and ensured the addition met rigorous local structural requirements.
To support the larger living area, we upgraded key infrastructure systems. A high-efficiency furnace was installed to deliver improved comfort and energy performance for the expanded square footage. We also installed a new heavy-duty electrical panel to handle modern power needs for lighting, HVAC, and appliances without overloading the home’s electrical system.
The main level was laid out for versatility and everyday comfort. We built a sophisticated junior suite that can serve as a guest room, home office, or private bedroom, depending on the homeowner’s needs. An elegant electric fireplace was added as a focal point in the living area, providing style and a low-maintenance heating accent that complements the modern interior finishes.
The new second story was designed as a true luxury retreat. It includes a sprawling primary suite with ample living area and a masterfully finished additional bathroom. Those spaces were planned to create privacy and comfort for the homeowners, while giving the home a cohesive, upscale feel across both floors.
Custom masonry work was integrated where appropriate to match the design intent and add architectural character. Every detail of the interior finishes was managed carefully, from door and trim selections to the placement of lighting and tile. Our team coordinated each trade to keep the schedule moving and maintain consistent quality throughout the project.
Navigating Denver zoning and building requirements was a key part of this project. The design and permitting phases required careful attention to local codes, setbacks, and structural standards, and our experience helped move the project through those steps efficiently. That knowledge was essential to delivering a compliant and well-built addition.
The result is an expanded home that offers dual suites, generous living areas, and durable, attractive finishes that add both functionality and long-term value. Homeowners gain more living space, improved mechanical systems, and a premium primary suite, all built to meet Denver, CO standards by Remaster Renovations.
Service provided: Room AdditionsBudget: $306,000
Location: Denver, CO
Project Image Gallery
Products Used
Engineered stone, Porcelain and ceramic tile, Drywall/Gypsum Board, Delta, Kohler, Hardwood Flooring, Lumber & Engineered Wood, Concrete & Cement, Asphalt shingles ,led lightsContact Remaster Renovations for Expert Home Remodeling in Centennial & the Surrounding Areas!